Layout - Left Frame
Monday, November 24, 2014

Downtown Stormwater Review

Downtown Stormwater Review

Inspections Underway On October 23, an engineering firm contracted by the City began performing closed circuit television inspections of stormwater infrastructure in the downtown area. These inspections are reviewing the condition of the city’s stormwater pipes downtown. Inspections will continue through the end of November.

If repairs to the drainage system are warranted, they would be coordinated with sewer system repairs in order to minimize the impact and disturbance downtown.



Return
Share with friends

Layout - Right Frame
Layout - Footer Top Left Corner Layout - Footer Top Right Corner
Terms of Use  Privacy  ADA Policy  ©2002-2014 City of Wilmington 
102 North Third Street - Post Office Box 1810
Wilmington, North Carolina 28402-1810
910.341.7800
Questions, Comments? Email Us!
Login