Progress

 The section numbers referenced below refer to the numbers shown on the Cross-City Trail Map

Completed sections:

    1a.  .5 mile loop in James E.L. Wade Park
    5.    1.22 mile loop in Halyburton Park
    16.  685 ft. in front of 1st Baptist Church Activity Center
    28.  8-foot sidewalk at UNCW entrance
    33.  9,600-foot multi-use path on Eastwood Rd
    36.  Existing 8-foot sidewalk along north side of Eastwood Road
    40.  Existing Summer Rest Trail

Design complete and construction funded:

    4. John D. Barry to Halyburton Park, 6.  Halyburton Park to Museum Dr.:

    City has appropriated $350,000 in Stimulus Funds towards the construction of this project (Phase I).  Scheduled to go out to bid in May and construction begin in July 2009.

    7.   Museum Dr. and Independence Blvd to Barclay Place

    Will be constructed as part of Independence Blvd widening project.  Construction contract has been awarded; construction to start in July 2009.

    24-26.  Multi-use path and sidewalk/bike lanes on Randall Pkwy from Independence to College Rd

    Will be constructed with the Randall Parkway widening project, which is scheduled to begin construction in 2010.

    32.  Multi-use path in Autumn Hall

In design and construction funded:

    14 A-23.  Independence from Converse Dr. to Randall Pkwy

    Currently under design.  City will be awarded $1,650,000 in Stimulus Funds for the construction if the design is complete by September 1, 2009.

    19.  Improved pedestrian crossing at Park Avenue and Independence Blvd, multi-use path from Hawthorne Road to Empie Park entrance

   Funded through NCDOT Safe Routes to Schools Program

    21.  Improved pedestrian crossing at Wilshire Blvd and Wrightsville Ave

   Funded through NCDOT

    34-35.  Improved pedestrian crossing at Military Cutoff Rd and Eastwood Rd

    Under design.  Construction to start in fall 2009.

 

Layout - Right Frame
Layout - Footer Top Left Corner Layout - Footer Top Right Corner
Terms of Use  Privacy  ADA Policy  ©2009 City of Wilmington 
102 North Third Street - Post Office Box 1810
Wilmington, North Carolina 28402-1810
910.341.7800
Questions, Comments? Email Us!