The section numbers referenced below refer to the numbers shown on the Cross-City Trail Map.
Completed sections:
1a. .5 mile loop in James E.L. Wade Park
5. 1.22 mile loop in Halyburton Park
16. 685 ft. in front of 1st Baptist Church Activity Center
28. 8-foot sidewalk at UNCW entrance
33. 9,600-foot multi-use path on Eastwood Rd
36. Existing 8-foot sidewalk along north side of Eastwood Road
40. Existing Summer Rest Trail
Design complete and construction funded:
4. John D. Barry to Halyburton Park, 6. Halyburton Park to Museum Dr.:
City has appropriated $350,000 in Stimulus Funds towards the construction of this project (Phase I). Scheduled to go out to bid in May and construction begin in July 2009.
7. Museum Dr. and Independence Blvd to Barclay Place
Will be constructed as part of Independence Blvd widening project. Construction contract has been awarded; construction to start in July 2009.
24-26. Multi-use path and sidewalk/bike lanes on Randall Pkwy from Independence to College Rd
Will be constructed with the Randall Parkway widening project, which is scheduled to begin construction in 2010.
32. Multi-use path in Autumn Hall
In design and construction funded:
14 A-23. Independence from Converse Dr. to Randall Pkwy
Currently under design. City will be awarded $1,650,000 in Stimulus Funds for the construction if the design is complete by September 1, 2009.
19. Improved pedestrian crossing at Park Avenue and Independence Blvd, multi-use path from Hawthorne Road to Empie Park entrance
Funded through NCDOT Safe Routes to Schools Program
21. Improved pedestrian crossing at Wilshire Blvd and Wrightsville Ave
Funded through NCDOT
34-35. Improved pedestrian crossing at Military Cutoff Rd and Eastwood Rd
Under design. Construction to start in fall 2009.