Lions Bridge Replacement Project

  • Project typeLions Bridge Reconstruction & Replacement
  • Project value$1,100,000.00
  • Project scheduleEngagement is currently underway. Design will be influenced by engagement data. City anticipates advertising for construction bids by winter 2027.

Overview

The City of Wilmington is replacing the Lions Bridge in Greenfield Park to reconnect sections of the park that were disconnected following the removal of the previous, structurally unsound bridge. The new bridge will restore an important connection within the park and support walking, biking, recreation, and access between areas of Greenfield Park. The project will consider the park’s established character and history while incorporating community input on select aesthetic elements, including the bridge’s appearance, decking materials, railings, layout, and potentially the landing areas.  

Your paragraph text (8).png

Project Area

Greenfield Lake's cross-section (above) showing the location where the former Lions Bridge connected two areas of Greenfield Park near E. Lake Shore Drive.


Project Description & Bridge History

The Lions Bridge Replacement Project will restore an important pedestrian connection within Greenfield Lake Park that was lost following the closure and removal of the former Lions Bridge. The project will replace the former bridge with a new, larger, ADA-compliant structure designed to improve accessibility, connectivity, and circulation throughout the park.


Lions Bridge: A Brief History

  • Built in the 1960s, the original bridge was approximately 210 feet long.
  • Affectionately called the “Turtle Bridge” or “Alligator Bridge” by some visitors.
  • Featured in the 1985 film Silver Bullet.
  • Closed in October 2023 after a damaged pile caused significant settlement.
  • Damaged by fire in October 2024 and demolished in early 2025.

Greenfield Lake Brief Overview

  • Greenfield Lake is relatively shallow, with an average depth of approximately 4-5 feet.
  • The lake reaches a maximum depth of approximately 7-8 feet near the dam.
  • The lake has an estimated surface area of approximately 100-150 acres.


Why This Project Matters

Greenfield Lake Park is a unique and well-loved part of Wilmington, valued for its natural setting, history, and distinctive character. Replacing the Lions Bridge provides an opportunity to restore an important connection within the park while preserving the qualities that make Greenfield Lake special.

  • The goal of this project is to provide a safe, accessible bridge that fits naturally within the park setting, respects the character and history of the area, and enhances the experience of walking and enjoying the lake for current and future generations.

Project Scope & Timeline

  • Replace the removed Lions Bridge to reconnect separated sections of Greenfield Park
  • Restore pedestrian and bicycle connectivity around the lake’s loop trail network
  • Design a new bridge that aligns with the park’s historic character and aesthetic
  • Incorporate community input on non‑structural elements such as deck layout, materials, and landing areas
  • Engineer all structural components (piles, clearance, foundation, safety requirements) according to regulatory standards
  • Conduct public engagement through surveys, events, and online tools during preliminary and conceptual design phases
  • Complete conceptual and detailed bridge design from late 2026 through 2027
  • Perform permitting and regulatory submissions in 2027
  • Bid the project in winter 2027–2028 and begin construction in spring 2028
  • Complete construction and restore full park connectivity by late 2028

Grant Funding

Great Trails State Program

  • Grant award: $500,000

Land and Water Conservation Fund (LWCF)

  • Grant amount requested: $450,000
  • Application has been submitted. 
  • The City expects to receive notification regarding the grant award fall 2026.


Lions Bridge Community Engagement

Community members are invited to share their preferences for how the new Lions Bridge should look and feel within Greenfield Park. The City is hosting two public engagement events where attendees can learn more about the project, review conceptual design renderings, and provide feedback. A community questionnaire is also available online to gather additional input on design preferences and features that are important to park users.

Public input will help inform the design as the project moves forward, with the goal of creating a bridge that meets community needs while preserving the unique character of Greenfield Park. Engagement will continue through October 31, 2026.


Upcoming Pop-Up Engagement Events

  • Recess at the Lake (Sunday, September 27) from 8 a.m. to 1 p.m. at 1941 Amphitheater Drive
  • Fall Fest at Maides Park (Friday, October 9) from 6 p.m. to 8 p.m. at 1101 Manly Avenue

 

Take the survey