17th Street MUP This 0.3 mile multi-use path will run along S. 17th Street from Harbour Drive to Shipyard Boulevard. It will connect to existing sidewalks and provide safe bicycle/pedestrian access to commercial areas along S. 17th Street. This project also adds pedestrian crosswalks at the intersection of S. 17th and Shipyard to enable safe pedestrian crossing of the intersection.
Dawson Wooster Streetscape Dawson and Wooster streets serve as a primary entrance and exit to the city. Planned improvements for the roadways include hardscaping, landscaping, and pedestrian amenities.
Eastwood Road This project is improving the look and function of Eastwood Road between Bretonshire Road and Cavalier Drive. This busy corridor is a primary route for traffic to Wrightsville Beach. Improvements include a median with traffic signals and U-turn areas along Eastwood Road between Cardinal Drive and Military Cutoff Road.
Fifth Avenue Street, Sidewalk, And Water Utility Improvement Project The City recently completed an improvement project along Fifth Avenue, a scenic connector between downtown and Greenfield Lake Park, through a coordinated effort that brought multiple plans, departments, and partners together around a shared goal.
Front Street Bridge Replacement The work will involve a full replacement of the bridge deck; repairs to existing pedestals; cleaning, painting, and repair of the steel members and substructure; and installation of a new three-bar metal rail system that complies with current NCDOT standards
Greenville Loop Park Project The City of Wilmington, New Hanover County, and The Endowment are pleased to announce a collaborative investment to support the City’s acquisition and preservation of approximately 25 acres of green space off Greenville Loop Road for the development of a public park.
Greenville Loop Trail The City of Wilmington is in the design and construction phase of Greenville Loop Trail, which has been split into four phases to expedite completion. The Greenville Loop Trail is part of the rapidly expanding network of multi-use trails being planned and constructed in the city.
Hooker Road Multi-use Path This Hooker Road multi-use path will run the full length of Hooker Road, connecting UNCW and the Cross City Trail to the existing bike lanes on Wrightsville Avenue.
Kenan Water Fountain Repair A project to return the frequently damaged Kenan Fountain to proper working order.
Kerr Avenue Trail This 0.7-mile multi-use path along Kerr Avenue will provide a safe pedestrian route from the UNCW campus and College Road to commercial areas north of Market Street via the NCDOT Kerr Avenue project.