Pine Valley Road Neighborhood Traffic Calming

  • Project typeNeighborhood Traffic-Calming
a rendering of the intersection of two roads

 

The City received a request from neighbors regarding safety at the Pine Valley Drive/Bragg Drive intersection and to consider an all-way stop. Based on the crash and volume data collected, an all-way stop is not warranted. However, City staff recommended relocating the stop signs from the Pine Valley approaches to the Bragg Drive approaches due to volume distribution.

The City held a community meeting in April 2026 to discuss this proposal and heard additional feedback from residents on other transportation and infrastructure concerns. As a result, City staff committed to taking a broader look at traffic conditions in the neighborhood, rather than focusing solely on the Pine Valley Drive and Bragg Drive intersection. Staff expanded the study's scope to evaluate a larger area and to collect additional traffic data to better understand how vehicles move throughout the neighborhood and where traffic-calming measures may be needed.

A follow-up meeting was held Aug. 25, 5:30 p.m. to 7 p.m., at Halyburton Park for interested parties to learn about the updated study results, discuss potential solutions, and share feedback before any decisions are made.

If you aren't able to attend, missed the meeting, or want to provide feedback after-the-fact, please use this form to share your thoughts through Set. 8!

We Want to Hear From You

The City presented the option of mini roundabouts, customizable designs to meet the needs of site-specific and physical right-of-way restrictions.

Existing mini roundabouts that you can look at in Wilmington include:


Follow-up Questions from the Meeting Addressed

Obstructed Visibility at Pump Stations

Residents raised concerns about the visibility obstruction at the pump station at the corner of Pine Valley and Kirby Smith.

City traffic engineers determined that while the pump station's brick fencing is within the 46-foot by 46-foot vision clearance triangle, after stopping at the stop sign, Pine Valley drivers can slowly and cautiously advance toward the intersecting street (Kirby Smith) to gain acceptable sight distance before entering the intersection.

This is typical and allowable driving practice for intersection approaches having various roadside obstructions. The vision obstruction of the intersecting street (Kirby Smith) while approaching the intersection and prior to stopping does not constitute an unsafe condition. The basic driving order-of-operations for approaching a stop sign-controlled intersection is as follows:

  1. Stop
  2. Looking for conflicting traffic (vehicles, pedestrians, bikes, etc.)
  3. Go when clear to do so

Frequently, drivers improperly reverse steps 1 & 2 to progress to step 3 more quickly, typically resulting in an incomplete step 1. Reversing the stop signs would alleviate this perceived obstruction to vision while also properly placing them along the minor street at the intersection (Kirby Smith) to comply with intersection traffic control standards. However, the recommended and proposed mini-roundabout will also alleviate this perceived vision obstruction issue (eliminating the need to yield to traffic from the right), while also providing traffic calming (speed reduction) for all approaches to and through the intersection.

*In the event the brick fencing is determined to be required to be modified to conform with the Land Development Code requirements, CFPUA can be contacted to initiate modification.

Stormwater and Drainage Concerns

City staff heard significant concerns about stormwater and drainage throughout the neighborhood, including residents, particularly older adults, being able to safely reach their vehicles during periods of standing water.

Specific areas mentioned included:

  • Eagles Nest/Osprey
  • Eagles Nest/Marsh Hawk
  • Red Berry Drive (3200/3300 blocks)
  • Amber Drive
  • Durby Court
  • Greenhowe Drive

We understand that there may be additional areas beyond the ones listed above, and we will look at the neighborhood as a whole.

Residents also shared information about previous stormwater-related efforts, including a contractor from Raleigh who visited the area several years ago and a letter received about the Red Berry project in 2022. City staff mentioned that repair work was done on Red Berry after Hurricane Florence and that a contractor from Raleigh may have been involved. Additionally, the 2022 letter was most likely about the current stormwater project underway for Red Berry. Currently, the project is 100% designed and awaiting final permits. We know it's been a long process and appreciate your patience.

Additional stormwater concerns can be reported here